Arrange the four graphs in descending order of total work done; where W1 , W 2 , W 3 and W 4 are the work done corresponding to figure a, b, c and d respectively.



Text Solution
Verified by ExpertsThe correct answer is:
A
Work done = area under F -x curve. Area below x-axis is negative & area above x-axis is positive.so W 3 >W 2 >W 1 >W 4
Prepare Smarter with CGP Edu
Get practice questions, solutions, and test series in one place.
Write a Review
Share your experience with this question and solution.
Commentary
Send your comment, doubt, correction, or feedback to admin.
Similar Questions
Explore conceptually related problems
A block of mass 10 kg starts sliding on a surface with an initial velocity of 9.8 ms -1 . The coeff…
A boy ties a stone of mass 100 g to the end of a 2 m long string and whirls it around in a horizont…
A particle experiences a variable force in a horizontal x-y plane. Assume distance in meters and f…
A stone of mass in, tied to a string is being whirled in a vertical circle with a uniform speed. Th…
Potential energy as a function of r is given by , where r is the interatomic distance, A and B are…
The ratio of specific heats in terms of degree of freedom (f) is given by: